The combination of Flow Heat Pump and Flow Gas Cooler on a common frame. CO2 piping is completed at the factory. The system is fully charged, tested, and shipped to the customer site ready to install. Only single point power, hydronic and controls communication connections are required. Custom options can include pumps or other hydronic components. This saves both time and money on construction projects.
Bölge bulunurluk durumu
Kuzey Amerika |
---|
Anguilla |
Antigua ve Barbuda |
Aruba |
Bahamalar |
Barbados |
Belize |
Bermuda |
Birleşik Devletler |
Caribbean Netherlands |
Cayman Adaları |
Curaçao |
Dominik |
Dominik Cumhuriyeti |
El Salvador |
Grenada |
Grönland |
Guadeloupe |
Guatemala |
Haiti |
Honduras |
İngiliz Virjin Adaları |
Jamaika |
Kanada |
Kostarika |
Küba |
Martinique |
Meksika |
Montserrat |
Nikaragua |
Panama |
Porto Riko |
Saint Barthélemy |
Saint Kitts ve Nevis |
Saint Lucia |
Saint Martin |
Saint Pierre ve Miquelon |
Saint Vincent ve Grenadines |
Sint Maarten |
Trinidad ve Tobago |
Turks ve Caicos Adaları |
Virjin Adaları |