Implementation of a ventilated under-ground cavity for a total height of ______ cm with the supply and on-site positioning of recycled plastic Iglu'® Plus formworks from the Daliform Group for the quick dry formation of a self-bearing pedestrian accessible platform above which the C25/30 concrete is cast to fill the formwork up to its crown and an upper slab of ______ cm reinforced with welded mesh Ø ______ cm 20 x 20 cm, levelled and smoothed with a plastering trowel.
The Iglu’® Plus formworks must have dimension of 50 x 50 cm between centres and ______ cm in height, rest solely on the four lateral feet to guarantee the maximum ventilation and facilitate the passage of utilities, and have a dry breaking resistance of 200 kg in any portion of the cap by means of an 8 x 8 cm pressure plate
Formworks in recycle plastic, such as Iglu'® Plus, must be produced in “ALAPLEN® CP30”, must not release polluting substances, have an Environmental Compatibility Certification and be produced by a Company Certified according to International Standards UNI EN ISO 9001 (Quality), UNI EN ISO 14001 (Environment); BSI OHSAS 18001 (Safety) and SA 8000 (Social responsibility).
The company that supplies the Iglù® formworks must exhibit technical sheet and safety sheet for the product and for “ALAPLEN® CP30” grain texture and must also exhibit the product certificate approved by an EOTA member agency (European Organisation for Technical Approvals).
Including accessories, waste, cutting and all other expenses: ______ /m2 ______